How Long Does It Take to Renovate a Bathroom? A Step-by-Step Guide

Bathroom remodelling or renovation projects are common in the UK, and most homeowners and landlords judge the quality of a house by the design and the bathroom before and after transformation. What does a professional bathroom renovation service aim to achieve? A professional bathroom renovation service aims to update outdated styles, designs, and worn materials, giving the space a fresh look and creating more room. 

What does modern design focus on in bathroom renovations? Modern design focuses on maximising space and ensuring efficient organisation by installing materials effectively. However, the time it takes for a bathroom before and after renovation is often debated. Despite its smaller size, the complex structure and design make planning, replacing, and installing new materials challenging. Many homeowners are left asking the same question: How long does it take to renovate a bathroom? If you have the same question, follow this guide, and you will find all your answers.

This blog provides information on how a bathroom can be renovated with simple steps, ensuring the process reduces time and effort. We will cover the step-by-step bathroom remodelling and effective strategies to complete the renovation efficiently.

bathroom renovation contractors

Creating Your Bathroom Renovation Timeline

This is the general bathroom renovation timeline and outline for carrying out the process smoothly. The manageable stages and dividing the tasks into the prescribed days help achieve the target within the timeline. You will find an example of how to structure your timeline, outlining each stage of the renovation. These bathroom renovation stages are more general and you might face more time and days to carry out these tasks.

Planning StagesDuration
Planning and Design1-2 weeks
Demolition1-2 days
Site Clean-Up and PreparationOne day
Plumbing and Electrical Work1-2 days
Fixture Installation1-2 days
Final Inspection and Clean-UpOne day

The Average Timeline of Bathroom Renovation

The timeline for the kitchen and bath remodel can’t be set before the project inspection. If your bathroom is old and you want a complete renovation, it might take longer, as new issues may arise that need addressing. However, if your bathroom is relatively new, and the pipelines, sewage system, tub, and walls are in good condition, time won’t be wasted on fixing these areas. 

The stages of bathroom renovation typically include planning, demolition, plumbing, and finishing touches. Following the step-by-step process might help reduce the time and effort. 

Step1. Planning and Design (1 to 2 weeks)

Before any physical work begins, a complete plan and outline of the work framework are determined. The contractor and the owner decide on the best option and what they want to install in their bathroom. 

So, the first step in planning and design is consulting a bathroom renovation contractor to understand the final needs, requirements, and expectations.

  • Consultation: Consultants from bathroom renovation services visit the site to inspect, suggest, and estimate the cost, time, and materials they will use. 
  • Estimation: This is similar to a feasibility study and includes inspection visits and initial measurements to confirm what’s feasible within your space.
  • Timeframe: The process can take 1,2 weeks for planning and deciding if the owner agrees to carry on.

Note: Planning and designing do not have any work to be done, so that is why it takes time; it is the time that the owner takes to decide, plan and hire the best renovation services.

Step 2. Demolition (1 to 2 days) 

Once the owner approves the design, the bathroom renovation process starts. The old fixtures, tiles, and damaged plumbing need to be demolished. How long can the demolition process take? Remember that this process can take one day to 2 days because of the complexity of the issues that you might encounter but not address in the timeline. This process is tedious and messy, and it might create noise and chaos around the house. Let’s break down the process layer by layer.

Removal of Old Fixtures

The first task in this phase is to remove outdated fixtures and finishes. This includes:

  • Tiles: Removing old tiles often requires specialised tools, such as tile chisels or pneumatic hammers, to lift them while avoiding physical damage to the underlying surfaces.
  • Bathtubs: Old bathtubs can be heavy and difficult to remove, so make sure the connections are detached before lifting and unmounting them.
  • Sinks and Toilets: To remove toilets, the wax ring seal should be removed, and the toilet itself should be lifted off the flange.

Structural Integrity

It is important to analyse the structural integrity. Contractors assess the condition of the walls and the old materials used inside them, checking for damage, rot, or mould. If there is rust on the iron materials, they need to be replaced.

Plumbing Inspection

The entire plumbing system can be at risk and requires a complete check-up for corroded pipes and drainage lines. Addressing these issues first can help avoid future construction costs and save time.

Note: This demolition process can be tricky because, at first, you might not know what is damaged and needs replacement and updation, so hope for the best and prepare for the worst case.

Step 3. Site Clean-Up and Preparation (1 day)

How long does the clean-up process typically take? After demolition, all the old fixtures need to be changed. Clear out all the materials in the bathroom first. The first step involves removing the tiles, leftover fixtures, pipes, and all the construction debris generated during the renovation process. The site needs to be prepared for further work. 

What happens after the clean-up is complete? Once the site is clean, the final measurements will be taken to check the available space. This process takes time because when the owner observes what type of material requires replacement, he might have to increase his budget or change the plan. 

The contractor will take these measurements to ensure all the materials are in place and ready to follow the plan according to the design specifications. In consultation with the owner, any necessary changes will be discussed and revised.

Note: This whole site cleaning can take up to an hour, but the site preparation for the work requires at least a day.

Step 4. Plumbing and Electrical Work (1 to 2 days)

During this stage, licensed professionals install or update:

  • Plumbing systems to accommodate new fixtures such as bathtubs, showers, and sinks.
  • Electrical wiring for lighting, heated towel rails, or underfloor heating.

This is one of the most critical steps in a bathroom remodel, as mistakes can cause future leaks or electrical issues. Ensuring your contractor follows local building regulations will prevent future problems and delays.

Note: Plumbing and electrical work might take a day or two because there are sanitation pipes and iron pipelines in the walls that can cause electric shock and be dangerous to handle.

Step 5. Fixture Installation (1 to 2 days)

All the necessary fixtures, such as the shower, toilet, and sink, need proper handling to avoid any physical damage during the cleaning process. What is the first step in this process? The first step is to carefully position all these fixtures in the designated areas according to the plan. There should be a proper framework and a layout indicating where each specific fixture should be installed, along with the specifications for replacement if necessary.

Why is proper sealing important? It is important to prevent leaking, wall gaps, and water dripping. What happens if there are alignment errors? These errors will haunt you until you redo the renovation process. This is a one-time job; these materials, particularly ceramic, are hard to replace repeatedly. So, it’s essential to ensure it is properly aligned in the structure.

No, you have completely addressed all the questions; install the fixtures with care:

  • The bathtub, shower, sink, and toilet are set in the proper place to prevent leaks.
  • Any bespoke fixtures or fitted storage might take longer to install.
  • Precision is key, as any errors in alignment can result in poor water drainage or leaks.

Note: Delays can occur if items like custom-made countertops or cabinetry arrive late.

Step 6. Final Inspection and Clean-Up (1 day)

  • The contractor will conduct a final inspection to ensure everything is installed correctly, from plumbing to electrical.
  • Any issues or adjustments can be addressed during this stage.
  • Once completed, a thorough clean-up is done, and the bathroom is handed over.
luxury bathroom in green marble decoraton hotel home interior horizontal 1

Small Bathroom Renovation Ideas

Follow these interesting and valuable bathroom refit ideas for a better look at the bathroom.

  • Floating Vanity – Use a floating vanity to clear out space and create an airy, modern look.
  • Wall-Mounted Storage – Install wall-mounted shelves to utilise vertical space, keeping the floor clear and making more room.
  • Compact Fixtures – Choose smaller or corner sinks, toilets, and showers to save space and fit perfectly in compact areas.
  • Glass Enclosures – Replace the shower curtain with a clear glass enclosure to open the room.
  • Large Mirrors – Use a large mirror with a light above it; that will provide more to maximise brightness and create the illusion of a larger space.
  • Bright and Light Colours – Use light colours like white or soft grey to make the room more open.
  • Pocket or Sliding Doors – Use a modern, space-oriented design; sliding or pocket doors are a better option than traditional ones.

Ways That You Can Minimise Delays in Your Bathroom Renovation

There are many ways to minimise the time required to renovate your bathroom. 

  • To avoid confusion, you must communicate your budget and requirements clearly with the renovation company before starting the actual work. 
  • Avoid supply issues by managing all the resources and materials needed to reduce delays for the renovation workers. 
  • Start with the bathroom tub remodel stage; it takes more time and space and will make it easier for you to carry out other tasks.
  • Keep track of your progress, the time it is taking, and your budget assessment regularly. 
  • Choose quality materials and don’t fall for the cheaper options, as this is a one-time job, and you do not want to compromise on quality for later renovations. 
  • Hire a professional and experienced renovation company for better results and quality work. 
  • Draw up a complete assessment of all the work and timeline before starting the project. 
  • Stick to the plan and avoid making unnecessary changes that can lead to budget shortages and time constraints.

Why Can a Bathroom Renovation Take Longer than Expected?

The following factors delay the bathroom renovation process more than expected. Check out and keep that in mind to avoid time and cost waste.

  • Hidden water damage or mould might appear during the renovation process.
  • Delays in material supply and availability can cause significant time waste.
  • Improvising your plan and making certain modifications during the project can extend the timeline significantly.
  • Plumbing and electrical complications with existing systems can necessitate additional work.
  • A lack of professional skilled workers may lead to delays in completing tasks.
  • Weather conditions can impact the timeline for renovations, especially for outdoor work.
  • Communication issues may arise. Misunderstandings between the homeowner and contractors can lead to delays.
  • Budget shortages and poor planning can cause the timeline to exceed normal expectations.

Conclusion

Through all the steps, you have learned how long it can take to renovate a bathroom in the best possible time. However, the duration depends on the renovation you want for your bathroom. If you attempt to do it yourself, you could damage the materials, costing you more than hiring professional services.

These steps typically take around 7 to 10 days after the planning phase to completely remake and renovate the bathroom. However, professional bathroom renovation services can complete the job in the best possible time with minimal effort, avoiding any physical material damage.

Buon Construction is a well-known and experienced home renovation and professional bathroom renovation service that offers customised solutions. Our expertise in handling renovation and remodelling projects is a testament to our success. We believe in delivering quality work in less time and with minimal budget. Get your bathroom a luxurious look and enhance your standard of living today with Buon Construction!

FAQs

What is an average cost to renovate a small bathroom?

The cost can vary greatly, depending on the complexity and the materials used, but it is recommended that you start with around £5,000.

What are bathroom refurbishment Ideas?

Refurbishment ideas can help in controlling costs. You can use bath remodel in one day using quick-install options, such as modular cabinets and ready-made vanities, which can save time and money.

What should be considered when hiring a contractor?

You should research the contractors’ experience, reviews, and qualifications to better understand the construction works.

What are the benefits of professional services?

They use professional methods and have extensive experience in material handling. They can help you save time and money and avoid physical damage.