Office renovation and commercial refurbishment across Nottingham, West Bridgford, Beeston, Arnold, Hucknall and the surrounding areas, planned around your business so you can keep trading.
Office renovation is the work of updating an existing workspace so it suits how your business runs today. It can be as simple as new flooring, lighting and decoration, or as involved as stripping the space back, changing the layout, upgrading the electrics, plumbing and heating, and fitting it out from scratch.
At Buon Construction, we renovate offices and commercial spaces across Nottingham and Nottinghamshire. We handle everything from a tired meeting room to a full strip-out and fit-out, with one point of contact managing the trades, the programme and the paperwork.
Most of the offices we’re asked to look at aren’t broken. They just no longer fit. The team has grown or shrunk, people work differently since hybrid working became normal, the meeting rooms are always booked, and the kitchen is a corridor with a kettle in it. A good refurbishment fixes the layout first and the finishes second.

No two offices are used the same way, so we don’t sell one-size-fits-all packages. We start by looking at how your team actually works: where people sit, how often they meet, where the noise comes from and what keeps getting in the way.
From there, we plan the layout, the lighting, the power and data, and the finishes together, so the new space works as well on a busy Monday as it looks on handover day.
From a single new meeting room to a complete Cat A or Cat B fit-out of an empty unit, one team manages the whole project from survey to snagging.
As a general contractor, we manage every trade, so you aren’t coordinating separate electricians, plumbers, plasterers and decorators yourself. You can also see all our building services in Nottingham.
Complete Cat A and Cat B fit-outs for new or empty units, taking a bare shell to a finished, working office.
Safe removal of old partitions, ceilings, flooring and fittings, with waste cleared responsibly and the space prepared for the new layout.
Stud or glazed partitions to create private offices, meeting rooms, quiet booths or open-plan areas, while keeping natural light moving through the floor.
New or replacement ceiling grids and LED lighting upgrades. Switching from old fluorescent fittings to LED usually brings running costs down too.
Rewiring, extra sockets, floor boxes, data points and lighting circuits by our electricians in Nottingham, planned around where desks will actually sit.
Staff kitchens, tea points and breakout areas from our kitchen renovation team, plus toilets and accessible washrooms fitted by our plumbers in Nottingham.
Making good by our plasterers in Nottingham, followed by hard-wearing decoration that suits a busy workplace.
Carpet tiles, commercial vinyl and hard flooring, chosen for the traffic each area will take and zoned to suit the layout.
Receptions, showrooms and retail interiors refurbished so the first thing customers see reflects the business behind it, with rendering in Nottingham to refresh tired frontages.

Most businesses can’t close for a month, and they don’t need to. We can phase the work so one area is finished before the next is started, with temporary hoarding keeping dust and noise away from your team.
We keep a clear, safe route through the building, protect the areas still in use, and can schedule noisy or dusty jobs for evenings and weekends if that suits you better.
The phasing plan is agreed with you before we start, so your staff and customers know exactly what’s happening and when.
Layout changes, meeting rooms, lighting, flooring, kitchens and full fit-outs.
Strip-outs, new interiors, lighting, flooring and customer areas.
Front-of-house refurbishment, washrooms, finishes and preparation for kitchen installs.
Partitioned treatment rooms, washable finishes, plumbing and accessible facilities.
Changing rooms and showers fitted by our bathroom fitters in Nottingham, plus flooring and lighting.
Cat A refurbishment to get a vacant unit ready to let.
If you’re taking on a new commercial unit, you’ll probably hear these two terms. Cat A is a clean, usable shell. Cat B turns it into your workplace.
| Cat A fit-out | Cat B fit-out | |
|---|---|---|
| What it is | A finished but empty space | A space fitted out for a specific business |
| Usually includes | Ceilings, lighting, raised floors, heating and cooling, basic power, toilets, decoration | Partitions, meeting rooms, kitchens, breakout areas, flooring, furniture, branding, data |
| Usually paid for by | The landlord or developer | The tenant |
Many projects sit somewhere in between, especially in older Nottingham buildings. Part of our survey is working out what’s already in place and what really needs replacing, so you don’t pay twice.

We visit, measure up and talk through how your team uses the space, what isn’t working and what you’d like to change.
We agree the layout, finishes and specification with you, including where power, data and lighting need to go.
You get a written quote showing what’s included, so you can compare it fairly and see where the money goes.
We prepare what’s needed for landlord consent, Building Regulations and any asbestos survey, and agree a programme around your working hours.
Old fittings come out, then new partitions, electrics, data and plumbing go in.
Ceilings, plastering, flooring, decoration, kitchens and washrooms are completed.
We walk the space with you, deal with any snagging, and hand over certificates and documents for your records.
Examples of the difference a new layout, lighting and finishes can make to a tired commercial space. Click any image to see it full size.



Time on site depends on the size of the space, its condition and how much is changing. Use these figures as a rough guide. Design, approvals and lead times for materials come on top.
| Type of project | Typical time on site |
|---|---|
| Redecoration and new flooring | 1–2 weeks |
| New meeting rooms or partition changes | 2–4 weeks |
| Retail unit refurbishment | 2–6 weeks |
| Full fit-out of a small to medium office | 4–8 weeks |
| Café or restaurant refurbishment | 4–10 weeks |
There’s no honest single price, because two offices of the same size can need very different amounts of work. The cost mainly depends on:
The quickest way to get a reliable figure is a free site survey. You’ll get a clear, itemised quote with no obligation to go ahead.


Commercial refurbishment comes with more paperwork than a home renovation. We tell you what applies at the survey stage, so nothing holds the work up later.
General guidance, not legal advice. Requirements depend on your building, your lease and the work involved.

Take a look through our office and commercial refurbishment work across Nottingham. Every space is planned around the business that uses it, from small studios to full office floors. Click any image to see it full size, or read about our recent construction projects.









We carry out office renovation and commercial refurbishment across Nottingham and the surrounding area, including:
Tell us about your space and what isn’t working. We’ll visit anywhere in Nottingham, talk it through and send a clear, itemised quote with no obligation. Planning work at home too? See our home renovations in Nottingham.
Yes. Most office renovations in Nottingham can be phased so one area is finished before the next starts, and noisy or dusty work can be scheduled for evenings or weekends. We agree the plan with you before work begins.
A redecoration and new flooring can take one to two weeks. A layout change with new partitions usually takes two to four weeks. A full fit-out of a small to medium office often takes four to eight weeks on site, plus time for design and approvals.
Most internal office work does not need planning permission. External changes, new shopfronts, a change of use and work on listed buildings usually do. Some internal changes still need Building Regulations approval, especially anything affecting structure or fire escape routes.
A Cat A fit-out leaves a space clean and usable but empty, with ceilings, lighting, raised floors, heating and basic services in place. A Cat B fit-out turns that shell into your workplace, with partitions, meeting rooms, kitchens, furniture, branding and IT.
It depends on the size of the space, its current condition, the specification, and how much electrical, plumbing and structural work is needed. The most reliable figure comes from a site survey and a written, itemised quote.
Yes. Most commercial leases need the landlord’s written consent before alterations, often called a licence for alterations. We can provide drawings and method statements to support your application, and plan the work around any reinstatement terms in your lease.